Six steps from inquiry to shipment, with lead time, tooling cost, packing, and export documents behind a custom order.
The Bit That's Not in the Catalog: ZZSEGU's Custom Engineering Process and Global Delivery System

A custom bit starts with four numbers on a form: hole size, connection, formation strength, and the weight the rig holds. Everything else - blade count, cutter diameter, crown height, gauge length - is solved from those. Most non-standard orders turn out to be two of them changed on a body someone already builds.

What Counts as a Custom Order

Three triggers that leave the catalog

Three conditions push an order out of the catalog. The first is size. A well designed around a 4-5/8 in hole, or a 12-1/4 in surface section, does not appear in a water-well list built around 6 in to 8-1/2 in, and neither does the 6-1/2 in bit needed to deepen below an existing 8-5/8 in casing. The second is the connection. Crews running 2-3/8 in or 3-1/2 in API REG pipe, or a fleet-standard NC31 string, need the bit to land on that thread rather than on the sizes a catalog happens to stock. The third is the rock, usually expressed as compressive strength per section: a quartzite band reading 140 MPa where the standard yard bit was laid out for 60 MPa and every assumption behind it fails above that. Everything else in the design follows from those three.

Where standardisation saves money instead

Two of those three are worth questioning before anyone signs a drawing. A special size almost always justifies itself, because the hole dictates it. A special connection is often cheaper solved with a crossover sub costing 80-200 USD than with a 15-20 day production slot, unless the string cannot spare the 150-250 mm of length the sub adds. Formation-driven changes are where custom money returns the most: moving from 16 mm to 13 mm cutters while adding a sixth blade, or stretching the gauge land from 25-40 mm to 50-75 mm, moves single-bit footage far more than it moves price. Non-standard work carries a one-time programming and tooling charge in the 150-500 USD band, which is why we ask whether the same configuration will be needed again. Above five pieces of one configuration that charge is normally absorbed.

Trigger

What changes in the design

Lead time

One-time charge

Worth it when

Unusual hole size

body diameter, cutter layout, junk slot width

15-20 days

200-500 USD

the hole dictates the diameter

Old well deepening

smaller body, longer gauge land, shoulder set

15-20 days

200-400 USD

going below existing casing or screen

Special connection

thread type and size, sometimes shank length

15-20 days

150-350 USD

no room for a crossover sub

Rock strength driven

blade count, cutter diameter, crown, gauge

15-20 days

none on existing sizes

footage and trips dominate cost

Catalogue item

nothing

7 days ex stock

none

standard sizes, common formations

Table 1. Lead times are measured from the signed drawing. Prices are the one-time programming and tooling charge, not the bit price.

The Six Steps From Inquiry to Shipment

Steps one to three, ending in a signed drawing

Step one is the condition sheet, four numbers and three facts: hole size, connection type and size, each formation with its compressive strength where it is known, target depth, circulation medium and rate, and the rig limits expressed as available weight and rotary speed range. Step two is the cutting structure and hydraulics proposal returned against those inputs - blade count, cutter diameter and total cutter count, crown height, nozzle count and size, and the rate of penetration window those choices imply. Step three is drawing confirmation, normally one revision round and 1-2 days, ending with a signed drawing that carries every dimension both sides will later measure against. Nothing enters the production schedule before that drawing has two signatures on it.

Steps four to six, ending in a packing list

Step four is first-piece inspection, about 2 days, where the first body off the line is measured against the confirmed drawing and the result is written down before the rest of the batch runs. Step five is the batch itself, 7-10 days for most orders of one to ten pieces, with each serial number tied to the drawing number. Step six is final inspection and packing: thread verified with the matching API or OEM ring and plug gauge and assembled to calibrated torque on a spare connection, face runout held inside 0.1 mm, then VCI film, foam support, and a fumigated wooden case under steel straps. Total calendar time from signed drawing to loaded container lands inside 15-20 days for non-standard work, and a change requested after step three restarts step three, which is the single most common reason a ship date slips.

Step

Buyer provides

We return

Working days

1 - Condition sheet

hole size, connection, rock per section, rig limits

feasibility answer with two or three options

1-2

2 - Proposal

which option to develop

blade, cutter, crown, nozzle layout and expected ROP

2

3 - Drawing

one revision round

signed drawing carrying every dimension

1-2

4 - First piece

nothing

measured report against the drawing

2

5 - Batch run

nothing

pieces with serial numbers tied to the drawing

7-10

6 - Final and packing

shipping instructions and consignee

thread and runout report, VCI packing, documents

1-2

Table 2. The six steps total 14-19 working days; most orders close inside the 15-20 day band once travel and inspection queues are counted.

Where Custom Money Buys Metres

Four configurations that return the charge

Four requests account for most custom work, and each carries a measurable return. Deepening jobs need a smaller body than the original hole, typically 6-1/2 in running below 8-5/8 in casing, with the gauge land stretched to 50-75 mm and a reaming set on the shoulders, because there is no second chance on a hole below an existing screen. Hard interbedded ground asks for a sixth blade with 13 mm cutters and a parabolic crown, accepting 25-40 percent less rate of penetration to reach footage in the 380-460 m band. Abrasive sections with weak solids control ask for carbide gauge pads instead of relying on cutters alone, so the hole stays at size after the cutters have lost height. Crews running mixed fleets ask for one drawing cut to two thread sizes, which removes adapters from the string and the failed connections that come with them.

Thread matching and how it is verified

A connection only has to be custom when it cannot be adapted, and when it is cut, verification protects both sides. Each thread is checked with its matching API or OEM ring and plug gauge and then made up to calibrated torque on a spare connection before shipping, because a bit that lands on the string but will not seal costs the contractor more than the bit did. Functional length is measured off the shoulder and confirmed against the pipe the crew actually runs, since a 2-3 mm error there delivers either no seal or a cracked pin. Where one fleet carries two standards, splitting the order beats running adapters. On deepening work the shank usually needs shortening, and that is a drawing item before it is a machine setting.

Request

Inputs we need

What changes

What it returns

Unusual diameter

hole size, casing drift, circulation rate

body diameter, cutter layout, junk slot area

a bit that fits the hole it was bought for

Deepening

existing casing inside diameter, screen depth, depth to add

smaller body, gauge land 50-75 mm, shoulder set

no second trip to repair below the screen

Hard interbedded

compressive strength per section, spacing of changes

sixth blade, 13 mm cutters, parabolic crown

footage 380-460 m at 25-40 percent less rate

Poor solids control

sand content by volume, quartz content, pump rate

carbide gauge pads, longer gauge land

diameter held after the cutters wear down

Mixed fleet

thread list per rig, connection standards

one drawing, two or three thread configurations

adapters off the string, failures with them

Table 3. Inputs are what the buyer already knows about the well; every line leaves the factory measured against those same numbers.

Lead Time, Packing, and Export Documents

The calendar from drawing signature to port

Lead time is half the delivery question; the port leg is the other half, and supply chains shifting toward delivery certainty have made it the half buyers plan around. Sea freight runs 18-25 days to South Asia, 25-38 days to East Africa, 30-45 days to West Africa, and 18-25 days to Central Asia by rail, so a dry-season start in December wants the drawing signed in September. Air freight costs 6-12 USD per kilogram and lands a single piece 7-10 days later, which makes sense for one sizeable order and rarely for a pallet. What damages tools in transit is usually not the carrier: it is condensation inside a sealed case and a load that was never blocked against movement.

Packing standard and what goes into the case

Packing runs in three layers: VCI film against the steel for corrosion protection through a humid sea leg, foam or moulded support against impact, and a fumigated wooden case closed with steel straps and stamped to the ISPM 15 standard. DTH hammers ship at 80-200 kg per piece, so each one gets its own case rather than sharing, and cases are blocked inside the container with dunnage so the load cannot shift. Desiccant goes in at 8-12 kg per 20 ft container, more where the routing passes a humid transhipment port, and every case is stamped on the outside with the serial number and drawing number so the crew can identify the configuration without opening it. Coastal discharge ports get an extra wrap for salt air.

Document

Issued by

What it states

When it arrives

Proforma invoice

us

configuration, price in USD, lead time, terms

before the order is placed

Commercial invoice

us

serial numbers, unit price, HS code 8207.19

with the shipment

Packing list

us

case count, net and gross weight, dimensions

with the shipment

Bill of lading

the carrier

routing, vessel, consignee

after departure

Certificate of origin

the chamber of commerce

origin declared for customs clearance

before the vessel arrives

Certificate of conformance

us

configuration built and the dimensions measured

inside every case

Extra test records

by agreement only

additional records a large-order contract names

per that contract

Table 4. The last line is not a standard deliverable; additional records are supplied only where a large-order contract names them in writing.

Claims, Records, and Reorder Economics

48-hour response and how a claim is settled

Claims settle against the signed drawing, which is why step three is not a formality. We answer a written claim within 48 hours with photographs from packing and the measurements taken at final inspection, and where the disagreement is dimensional both sides measure the same feature on the same returned tool. Records for a given serial number stay searchable at the factory, and any piece found outside tolerance goes to rework with a written disposition record rather than into a later batch. Third-party inspection happens when the buyer commissions and pays for it; on those days we supply the drawings, the gauges in use, and access to the inspection area so their inspector can do the job.

Keeping the drawing number costs nothing and saves days

Reorders are where the cost of customisation drops. Once a drawing exists under a number, the two-day proposal step disappears and most repeat configurations leave in 10-15 days instead of 15-20. Two habits make every following order cheaper: file the drawing number with the purchase record, and send the field result back with the reorder - metres drilled, rate of penetration by section, the formation actually found, and the dull condition recorded as the crew saw it. A dozen lines of that tell the next engineer which of the four numbers to move and give the factory what it needs to quote the second configuration around a drawing that already exists.

Custom work is not exotic. It is four numbers changed on a body somebody already builds, measured against a drawing two parties signed, shipped in packing that survives the port, and documented by people who expect to be measured against the same drawing next year. Buyers who file the drawing number and send the field numbers back find that the second order is cheaper than renegotiating a second time, and that the third configuration can be quoted the day it is drawn.

A custom bit order runs six steps in 15-20 days, costs 150-500 USD in one-time tooling, and ships with a certificate of conformance plus the usual export set. File the drawing number and the second order gets cheaper and faster.

Frequently Asked Questions

Q1: What information do you need before quoting a custom bit?
A: Four numbers: hole size, connection type and size, each formation with its compressive strength, and the weight and rotary speed your rig actually holds. Circulation medium and rate help too, especially where sticky clay forces higher flow.
Q2: How long does a non-standard bit take, and what does it cost to set up?
A: Fifteen to twenty days from a signed drawing, plus seven to ten by air or eighteen to forty-five by sea. One-time programming and tooling runs 150-500 USD, usually absorbed at five or more pieces.
Q3: Can existing drill pipe threads be matched without an adapter?
A: Usually yes. We cut the thread to your standard and check it with the matching API or OEM ring and plug gauge, then assemble to calibrated torque on a spare connection before shipping.
Q4: What documents ship with an order, and who issues them?
A: Commercial invoice, packing list, bill of lading, certificate of origin, and a certificate of conformance in every case. Extra inspection records come only where a large-order contract specifies them in writing.
Q5: How does the ZZSEGU brand handle custom orders and global delivery?
A: ZZSEGU builds 4 to 8-1/2 inch PDC bits, tricone and DTH bodies to drawing, with 13, 16, and 19 mm cutters, custom threads, and non-standard sizes. Standard sizes ship in seven days, custom configurations in 15-20.